Reservoir,
which was inaugurated by President Soeharto 20 November 1996 made by
damming time ago Ngrancah, with construction costs reached Rp 22 billion
and be completed within two years and eight months. For the construction of this dam, the local government did transmigration mass of Kulon Progo aka "Bedol village". A
total of 100 families were resettled to Tak Toi Bengkulu and 7 families
were resettled to the Nucleus Plantations (PIR) Riau Palm Oil. The purpose of this dam is for irrigation systems suppletion Kalibawang area that has coverage of an area of 7,152 Ha. The irrigation system is an interconnection of several irrigation areas.
Sermo Reservoir consists of a main dam which is a type of stone urugan berzona with watertight core. Dam
has a peak elevation of +141.60 feet with a length of 190.00 meters,
8.00 meters wide, 58.60 meters high and max volume urugan 568.000
meters. Coffer dam with urugan type of stone and water-resistant blanket that has a summit elevation> 105.00 meters. Building
type spillway with "ogee" without a door that has a 26-meter wide
spillway, summit elevation of 136.60 meters, energy absorbers tub and
floor ejection energy absorbers. Building
a tunnel with a horseshoe shape with a diameter of 4.2 meters which has
a capacity of 179.50 cubic meters per second, the elevation of 89.00
meters inlet and outlet elevation of 84.00 meters. During
the Sermo Reservoir utilized as a source of clean water by the Regional
Water Company (PDAM) and irrigation water to irrigate rice fields in
the surrounding area and Wates. Sometimes
the location of reservoirs used for rowing race like that happened
recently and for training for the Air Force Academy (AAU), also
frequently used as an object of academic discussion on the evaluation of
geological engineering and vulnerability of ground movement around the
reservoir (especially on the back wall of the dam west / right).
sumber: WiKi